Expression of Interest for Builder

Mt Rose Homestead.

Thank you for the opportunity to submit our Expression of Interest for the construction of the Mt Rose Homestead.

We confirm from the outset: we accept the managing contractor model proposed for the project, and we would commit to it in full:

  • A fixed construction program, committed to the day.
  • A fixed preliminaries, overheads and margin amount, established from a detailed cost plan and market trade costs.

We note the full design & construct contract will need to be reviewed at a later stage, to clarify any design responsibilities held by the managing contractor.

This is not a model we would be trialling at Mt Rose. We bring detailed, recent experience of exactly this contracting arrangement on single dwellings worth $20M+ — three of which are presented as case studies on the following pages.


24
months · anticipated construction program for mt rose
15%
proposed markup on trades

The Case Studies.

Three delivered homes. One model — the model proposed for Mt Rose: a fixed program, fixed preliminaries, overheads and margin, and trades bought at market cost. Every managing-contractor responsibility listed on page 8 of the EOI was completed by W. on all three projects.


$20M+
single dwellings delivered under this exact contracting model
×3
case studies · one fixed-cost model · all delivered

Howqua.

Rob Mills Architecture · Off-grid · Regional Victoria

Our case study in sustainability and off-grid regional building. A fully self-sufficient home — power, rainwater and septic — reached by a 25 km track, cut into environmentally sensitive country in the highest-rated bushfire zone. The majority of contractors at Howqua were local regional trades we met for the first time on this project; where the regional market could not service a need, we brought contractors up from metro Melbourne. Remote site, new trade base, same locked cost — delivered.

Howqua residence Howqua residence Howqua residence Howqua residence Howqua residence Howqua residence Howqua residence Howqua residence

221 Domain Road, South Yarra.

B.E Architecture · c1903–2025

A three-storey restoration and extension to a grand period mansion, including a 13-car basement. Finished on time and on budget, with preliminaries, overheads and margin locked from the outset — precisely the commitment we are offering Mt Rose.

221 Domain Road residence 221 Domain Road residence 221 Domain Road residence 221 Domain Road residence 221 Domain Road residence 221 Domain Road residence 221 Domain Road residence

31 McIlwain Drive, Mermaid Waters.

Jayson Pate Design · Gold Coast · 2024–2025

A three-level home with basement on a revered, north-facing waterfront site on the Gold Coast. Finished two months early — and completed in another state, with a subcontractor base we met and built from scratch. The model travels: new region, new trades, same fixed cost, same result.

31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence 31 McIlwain Drive residence

Comparable Projects.

Four comparable single residences, each delivered by W. on a fixed-cost basis. We have deliberately not published client names — the architects are named below, and the people who will speak for these projects are on the References page.

Howqua

Completed
ArchitectRob Mills Architecture
ContextOff-grid · regional Victoria
ModelFixed program · fixed prelims, OH & margin
OutcomeDelivered in full, off the grid

221 Domain Road, South Yarra

On time · On budget
ArchitectB.E Architecture
ContextPeriod restoration · 13-car basement
ModelLocked prelims, OH & margin
OutcomeOn time · on budget

31 McIlwain Drive, Mermaid Waters

2 months early
ArchitectJayson Pate Design
ContextWaterfront · interstate delivery
ModelSame fixed-cost model
OutcomeFinished two months early

26 Hopetoun Road, Toorak

Finished early
ArchitectB.E Architecture
ContextFour-level off-form concrete residence
Contract$11M · fixed price
OutcomeFinished early

The Project Team.

A full-time, dedicated project team — Project Manager, Contract Administrator and Site Foreman — provided from start to finish.

01

The Site Foreman will be from this area, or will relocate to it — close to the site, on site every day.

02

Administrative functions will run from our Melbourne office, with site visits weekly. One dedicated team, start to finish.

03

Every member of our team carries experience in $10M+ single-dwelling construction.

04

The final names of the people proposed for the project will be provided closer to project award, once timeline and preferred status are realised.

05

A list of key subcontractors will be provided with our detailed program and pricing submission. If we progress to the next stage, we would need approximately three weeks to provide this.

06

That future detailed pricing submission will include 3D construction methodology, detailed cost plans, and a bill of quantities with markups and trade recommendations.

Schedule of Rates.

Hourly costs & markup

Project Manager$200 / hr
Contract Administrator$150 / hr
Site Foreman / Manager$200 / hr
General Labour$100 / hr
Proposed markup on trades15%
Notes

We believe the preliminaries, overheads and margin allowances appear to be accurate in the current cost plan.

We do not anticipate needing hourly rates for our staff. We believe this component of the contract should be fixed — and in the history of the business, we have never charged our staff in an hourly manner.

The Program.

At this stage, we would say the project would be completed within 24 months.


24
months · construction program — then committed to the day, and fixed

If we progress to the next stage, we would be happy to provide a full detailed program and 3D construction methodology within three weeks.

Insurance & DBI.

01

All insurances requested under the EOI are able to be provided, and will be evidenced with certificates of currency.

02

Domestic Building Insurance (DBI): eligibility documentation will be provided with our detailed submission.

Time. Cost. Quality.

Our process for protecting all three is a single promise of alignment — proven on sites harder than most.

Australia's Legacy Private Residential Builder
One Promise. True Alignment.

Our interests and our client's interests are aligned across every dimension of the project.

Together We Reclaim Time.

Every build is programmed to the day against a live schedule our clients can see. Our fee is fixed — we have no incentive to extend and every reason to deliver early.

Together We Protect Cost.

Every cost is competitively tendered, benchmarked against market, and filtered through a trained financial model fine-tuned on a decade of commercial data. Our fee is fixed against a defined scope. Every dollar saved on trades protects the client's cost and our margin.

Together We Perfect Quality.

Defect-free at handover. No leaks. No unfinished work. Every stage inspected and documented against a quality system defined by national exposure and supported by the most cutting edge construction technology stack available. Our reputation is our pipeline.

Together We Elevate the Experience.

Live site cameras streaming to your device, a private daily feed of progress and milestones, one dedicated app for all communication, documents, data, and your W. team. A build with no blind spots is a build with fewer queries to answer. Transparency serves both sides.

Four Guarantees. One Promise. True Alignment.

Proven on site.

Howqua.

Sensitive Land · Extreme Bushfire Zone

Twenty-five kilometres of access track, in an extreme, highest-rated bushfire zone. A major retaining structure cut into the land among native trees, and major rainwater and septic systems connected — all with minimal disturbance to the environmentally sensitive surrounds. The sensitive handling of the surrounding land was a major focus of the project, at every stage, to handover.

221 Domain Road, South Yarra.

Significant Trees · Live Streetscape

To bring some of Melbourne's most significant mature trees into the site, we shut down one of South Yarra's major thoroughfares and craned them over the 12-metre-high existing dwelling. Watch Sarah tell the story of the plantation and the trees.

The technology stack.

At Howqua, Starlink-connected site cameras gave the client full 24/7 transparency — no blind spots — beside a private social feed exclusive to the client and the project management team. Every W. site runs the same stack:

Starlink connectivityLive site data from day one — even fully off-grid.
Site cameras · 24/7Full transparency with no blind spots, streaming to your device.
Private client feedA private social-media feed of progress and milestones — exclusive to the client and the project management team.
BuildpassDigital site management — inductions, compliance and records in one place.
Defect routinesScheduled defect inspections, documented and closed out stage by stage.
Camera routinesProgrammed photographic capture of every element before it is covered up.
Matterport scansThe whole home captured in interactive 3D at key stages of the build.
3D methodologyThe build sequenced and communicated in 3D before we start.
Live programProgrammed to the day, visible to the client throughout.

Walk through a W. scan.

Matterport · Interactive

This is a live Matterport scan from a W. project — not a video. Click, drag, and walk from room to room the way our clients do throughout their build.

Live Matterport scan · click + drag to look · click the floor to walk

The Company.

The facts, plainly.

Company details

BuilderW.BUILD
Chief Executive OfficerScotty Wilcox
BaseMelbourne, Victoria
Delivering inVIC · QLD
Instagram@w.buildau

References.

Architects are named by firm only alongside each project. The people below will speak for us — their full details live on this page alone.

221 Domain Road residence Jon Boucher Director · B.E Architecture Projects: Hopetoun Road · Domain Road
jon.b@bearchitecture.com
043 839 7199
31 McIlwain Drive residence Ed Crowley Client Reference · Gold Coast Project: Mermaid Waters (Gold Coast)
edward@crowleyprojects.net
+61 401 830 667
31 McIlwain Drive residence Jayson Pate Director · Jayson Pate Design Project: Mermaid Waters (Gold Coast)
info@jaysonpatedesign.com.au
042 284 8474
221 Domain Road residence 31 McIlwain Drive residence 221 Domain Road residence 31 McIlwain Drive residence 221 Domain Road residence 31 McIlwain Drive residence

Let's build Mt Rose.